General
Three main roads with numerous residential streets, comprising 147.3 kilometres or bitumen roads and 36.2 kilometers of gravel roads, as well as storm water systems are maintained by this department.
An electronic pavement management plan is in place to assist in upgrading and maintaining streets and storm water. The first system was done in 2005 and upgraded in 2009. This system needs to be upgraded every 5 years in order to prioritise maintenance and resealing of roads.
A Storm water Masterplan was done in 2007 for this department to priorities upgrading and maintenance to the storm water system. The Department of Provincial Roads allocated R4.7 million to upgrade Long Street in Bredasdorp in the current year, after the application was done 3 years ago.
Composition and Staff
2 Foremen (one for Bredasdorp and Napier,
one for Struisbaai area)
2 Store Clerks
5 Team Leaders
2 Truck Drivers
1 Digger Loader Operator
2 Bricklayers
20 General Workers
Available Documents
List of studies / documents available on request.
Pavement Management System (PMS)
Storm water Masterplan
Contact Details
Head of Section: Mr John Daniels
E-mail: info@capeagulhas.com
Telephone number: 028 425 5597
Fax: 028 425 1019
Physical Address:
1 Dirkie Uys Street, Bredasdorp, 7280
Postal Address:
Cape Agulhas Municipality, P.O. Box 51, Bredasdorp, 7280
|
|